Internet2 IP Network Operations Report
04/07/2008 - 04/13/2008

Internet2 IP Network Operations Center
at Indiana University

New Customers

None


Upgrades

None


New Services

None


Unscheduled Outages Summary

Ticket Number Customer Impact Network Impact Title Outage Type Start Time (UTC) End Time (UTC)


None during this report period

Scheduled Maintenances Summary

Ticket Number Customer Impact Network Impact Title Maintenance Type Start Time (UTC) End Time (UTC)

11960 4-Normal 3-Elevated Internet2 IP Network Backbone Circuit CHIC-ATLA Maintenance Completed Hardware 04/11/2008 3:26 AM 04/11/2008 3:27 AM
11961 4-Normal 3-Elevated Internet2 IP Network Backbone Circuit KANS-SALT Maintenance Completed Hardware 04/11/2008 4:38 AM 04/11/2008 4:39 AM
11888 4-Normal 3-Elevated Internet2 IP Network Backbone Circuit ATLA-HOUS Maintenance Completed Circuit 04/12/2008 8:55 AM 04/12/2008 8:58 AM
04/12/2008 9:13 AM 04/12/2008 10:56 AM

Scheduled Maintenances Detail

Ticket No.:11960:45
Subject:Internet2 IP Network Backbone Circuit CHIC-ATLA Maintenance Completed
Affected:Internet2 Backbone Circuit CHIC-ATLA
Connector University Memphis
Start Time:Friday, April 11, 2008, 3:26 AM (0326) UTC
End Time:Friday, April 11, 2008, 3:27 AM (0327) UTC
Description: Internet2 IP Network Engineers, working with Level(3) Communications Technicians, performed hardware maintenance on the Internet2 ATLA T640. Maintenance has been completed.

Ticket No.:11961:45
Subject:Internet2 IP Network Backbone Circuit KANS-SALT Maintenance Completed
Affected:Internet2 IP Network Backbone Circuit KANS-SALT
Start Time:Friday, April 11, 2008, 4:38 AM (0438) UTC
End Time:Friday, April 11, 2008, 4:39 AM (0439) UTC
Description: Internet2 IP Network Engineers, working with Level(3) Communcations Technicians, performed hardware maintenance on the Internet2 KANS T640. Maintenance has been completed.

Ticket No.:11888:45
Subject:Internet2 IP Network Backbone Circuit ATLA-HOUS Maintenance Completed
Affected:Internet2 IP Network Backbone Circuit ATLA-HOUS
Internet2 DCN Network Backbone Circuit BATO-JACK
ESNet Backbone Circuit ALBU-ATLA
Connector LONI
Start Time:Saturday, April 12, 2008, 8:55 AM (0855) UTC
End Time:Saturday, April 12, 2008, 8:58 AM (0858) UTC
Start Time:Saturday, April 12, 2008, 9:13 AM (0913) UTC
End Time:Saturday, April 12, 2008, 10:56 AM (1056) UTC
Description: Level(3) performed fiber repair in Bruce, FL. Maintenance has been completed.


Downtime and Availability



Internet2 IP Core NodesDown TimeReporting Period Availability52 Week Availability
** CHIC T6400 hr 0 min100.00000%99.99646%
** NEWY T6400 hr 0 min100.00000%99.99609%
** SEAT T6400 hr 0 min100.00000%99.99572%
** WASH T6400 hr 0 min100.00000%99.99814%
** HOUS T6400 hr 0 min100.00000%99.99851%
** LOSA T6400 hr 0 min100.00000%99.99907%
** ATLA T6400 hr 0 min100.00000%99.99553%
** SALT T6400 hr 0 min100.00000%99.99795%
** KANS T6400 hr 0 min100.00000%99.99702%

Aggregate Internet2 IP Core Nodes0 hr 0 min100.00000%99.99717%

** Less than 52 weeks of data available

Internet2 IP Backbone CircuitsDown TimeReporting Period Availability53 Week Availability
** I2-CHIC-ATLA0 hr 1 min99.99008%99.33069%
** I2-CHIC-NEWY0 hr 0 min100.00000%99.50477%
** I2-CHIC-KANS0 hr 0 min100.00000%99.85664%
** I2-CHIC-WASH0 hr 0 min100.00000%99.86725%
** I2-NEWY-WASH0 hr 0 min100.00000%99.93949%
** I2-WASH-ATLA0 hr 0 min100.00000%99.84342%
** I2-ATLA-HOUS1 hr 46 min98.94841%99.40795%
** I2-KANS-ATLA0 hr 0 min100.00000%99.84007%
** I2-KANS-SALT0 hr 1 min99.99008%99.99981%
** I2-SALT-SEAT0 hr 0 min100.00000%100.00000%
** I2-HOUS-LOSA0 hr 0 min100.00000%99.86744%
** I2-LOSA-SALT0 hr 0 min100.00000%99.92311%
** I2-LOSA-SEAT0 hr 0 min100.00000%99.99702%
** I2-KANS-HOUS0 hr 0 min100.00000%99.97878%

Aggregate All Internet2 IP Backbone Circuits1 hr 48 min99.92347%99.81117%





Upcoming Scheduled Maintenances

Ticket No.:12085:45
Subject:Internet2 IP Network Backbone Circuit CHIC-WASH Maintenance
Affected:I2-CHIC-WASH-ESNET-00070
I2-CHIC-WASH-I2-00002
I2-CLEV-PITT-I2-00004
I2-CLEV-WASH-OARNET-00022
Start Time:Thursday, May 15, 2008, 4:00 AM (0400) UTC
End Time:Thursday, May 15, 2008, 10:00 AM (1000) UTC
Description: Backbone Circuit CHIC-WASH will undergo circuit maintenance as Level(3) Communications performs a hot cut at Akron, OH. An outage of 2 hours is expected, however the entire window is reserved.

Ticket No.:12034:45
Subject:Internet2 IP Network Backbone Circuit HOUS-LOSA Maintenance
Affected:Internet2 IP Backbone Circuit HOUS-LOSA
Internet2 Ciena Backbone Circuit ELPA-HOUS
ESNET IP Backbone Circuit ALBU-ATLA
Start Time:Thursday, May 8, 2008, 5:00 AM (0500) UTC
End Time:Friday, May 9, 2008, 11:00 AM (1100) UTC
Description: Level(3) will be relocating fiber in Comstock, TX due to a Texas DoT project. This maintenance spans two nights, with work being performed between 5:00 AM and 11:00 AM UTC each night. An outage of up to 1 hour is expected during each window; however, the entire windows are reserved.

Ticket No.:12079:45
Subject:Internet2 IP Network Backbone Circuit SALT-SEAT Maintenance
Affected:Internet2 IP Network Backbone Circuit SALT-SEAT
Start Time:Friday, May 2, 2008, 3:00 AM (0300) UTC
End Time:Friday, May 2, 2008, 4:00 AM (0400) UTC
Description: Internet2 and Level(3) Engineers will be replacing hardware in the Seattle Juniper T640. The entire window is reserved.